1. Home
    2. Showroom
    3. Lotus
    4. Emeya
    5. Gt Se
    6. Cost Of Ownership
    Lotus Emeya

    Gt Se Cost of Ownership

    Explore the cost of ownership of Lotus Emeya Gt Se
    Showing 1 Configuration

    Gt Se

    Automatic, 5-door Hatchback, Electric, 4x4

    $199,990

    WLTP Emissions

    BEV (Combined): 0.0
    BEV Testing Type: BEV

    Fuel

    Generic Primary Fuel Type: Electric
    Fuel Type: Electric

    Charging Connector

    CCS (Combo) Charging Socket DC 1: yes
    CCS (Combo) Location of DC 1 Socket: Rear Side
    CCS (Combo) Type: Ccs (Combo)
    Type 2 (Mennekes) Charging Socket AC 1: yes
    Type 2 (Mennekes) Location of AC 1 Socket: Rear Side
    Type 2 (Mennekes) Type: Type 2 (Mennekes)

    Charging Information

    Mode 2 Quoted kW Supplied To Vehicle: 2.30
    Mode 2 Scenario: Mode 2
    Mode 3 Calc Duration Max Supplied 0% To 100%: 5.11
    Mode 3 Calculated Duration 3.7 kW 0% To 100%: 30.52
    Mode 3 Calculated Duration 7.4 kW 0% To 100%: 15.26
    Mode 3 Duration: 5.50
    Mode 3 Max kW Supplied To Vehicle: 22.00
    Mode 3 Quoted kW Supplied To Vehicle: 22.00
    Mode 3 Scenario: Mode 3
    Mode 3 State of Charge Ends At (%): 100
    Mode 3 State of Charge Starts At (%): 0
    Mode 4 Calc Duration Max Supplied 10% To 80%: 0.28
    Mode 4 Calculated Duration 100 kW 10% To 80%: 0.97
    Mode 4 Calculated Duration 50 kW 10% To 80%: 1.94
    Mode 4 Duration: 0.33
    Mode 4 Max kW Supplied To Vehicle: 350.00
    Mode 4 Quoted kW Supplied To Vehicle: 350.00
    Mode 4 Scenario: Mode 4
    Mode 4 State of Charge Ends At (%): 80
    Mode 4 State of Charge Starts At (%): 10

    Electric Power Source

    Actively Heated Cooled Battery: yes
    Battery Supplier: Contemporary Amperex Tech
    Battery Type: Nickel Manganese Cobalt
    Battery Voltage: 705.0
    High Power Charger: yes
    Max Wireless Charging (kW): 0.0
    Maximum Battery (kWh): 102.22
    Number of kWh Included: 0
    Number of Months Subscription Included: 0
    Onboard Charger: 22.0
    Useable Battery (kWh): 98.90

    Autonomous Drive

    Active Lane Control: yes
    Highway Assist: yes
    Level: 2 - Partial Automation

    Intermediate Service

    Distance (km): 30000
    Distance (miles): 18641
    Period (Months): 24

    † Displayed prices exclude on-road costs such as delivery charges, registration fees, number plates, insurance and applicable road taxes. These prices are subject to change without notice and may not reflect current market pricing or dealer offers.

    JATO logoAutomotive Vehicle Spec Data & 4K images Powered by JATO Dynamics Ltd